Barion Pixel

Ship playset PPS 1100

Delivery may take up to 4–5 weeks.

Recommended for children aged 3 and above, this ship-themed play structure offers a diverse and engaging play experience with multiple deck levels, connecting tunnels, climbing elements, and interactive play panels featuring a variety of skill-based activities. Its detailed ship-inspired design encourages adventurous role-playing while helping to develop coordination, balance, motor skills, and social interaction. The long, interconnected layout allows multiple children to play simultaneously, promoting active exploration and cooperative play. With a free fall height of 1.42 m, the equipment complies with the requirements of the PN-EN 1176-1 and PN-EN 1176-3 standards, and spare parts are available to ensure safe and reliable long-term use.

Age:
3+
Free fall height:
1,42 m
Safety zone:
731 × 1725 cm
Safety area:
90,10 m²
Total height:
4,66 m
Width:
4,31 m
Length:
13,65 m
Product code: PPS 1100
Standard: PN-EN 1176-1, PN-EN 1176-3
Spare parts availability: yes
Flox double spring rider 1
Flox double spring rider 2
Flox double spring rider 3

Let’s create together
a community space full of experiences

Contact us and let’s design a safe and inspiring playground or sports area for your community. Our expert team provides full support from concept to implementation.

Request a custom quote →

Panda Play professional blog

Useful information for designing playgrounds and sports facilities

Playground standards

What standards apply to playgrounds?

Proper application of safety regulations and impact-absorbing surfaces is essential for public playgrounds.

Read more →
Funding opportunities for playground construction

What funding opportunities are available for playground construction?

Several government grants can support municipalities in building modern and safe playgrounds.

Read more →
Sports facility design considerations

What to consider when designing a sports facility?

Proper surfacing, load capacity and long-term sustainability are key to successful implementation.

Read more →